Wednesday, November 25, 2009

These Guys are Good!

The garage slab is now poured, finished and is just curing. If anyone needs good concrete flatwork let me know. ABC Concrete has done a great job on all our flatwork. They really know what they are doing, plus they crack me up with all their complaining and harassing of each other:-) I can't wait to put the garage to use. With the heated floors and fully insulated walls and ceiling it will be a pleasure to work on all the projects in

Monday, November 23, 2009

Lighting

Here a couple of wall sconces that I picked up....at about 70% off! Two of these for the entry and landing of the stairs.
For the wall lights on either side of the Master Bed.

Friday, November 20, 2009

Liebherr Refigerator!

A little dirty right now but you get the idea.........Lots and lots of room!



Wednesday, November 18, 2009

Carpet

All Natural wool carpets! Check them out:
Bedroom CarpetFamily Room and Hallway Carpet



Monday, November 16, 2009

Tile Options

Not the best pictures but here are two samples of slate tiles: Option A
Option B (ignore the crack....someone stepped on it with his huge out of shape mass :-)

Friday, November 13, 2009

Painting = Color!

Master Bedroom - I love the clear stain on the windows
Living Room - Not sure why this picture is spotty? The celing is next to get stained.

Family Room - Accent wall with Steve fighting through his cold to get the work done:-)


Master Bathroom Bathtub - 6 feet long and 21 inches deep with heated sides, a perfect tub for soaking!