Thursday, March 18, 2010

Final Details!

The Garage is full of our belongings!  We emptied the storage units and found stuff we forgot we even owned! :-)
Step 2 is to move these items into the appropriate room as we finish the trim and clean up.
Speaking of trim, here are two doors all trimmed out.  They turned out great!  The base trim still needs to go in.
Most importantly here is the City of Kirkland Inspection Record with all the Final Inspection completed and signed off!!!!!!!!!!!!!!!!!!   We can officially move in to the entire house.  Very happy to get that hurdle completed.  Many people hear nightmare stories about dealing with cities and jurisdictions over permitting and inspections and I personally have experienced many painful ones.  Not so with the City of Kirkland!  They have been very helpful and a pleasure to work with through the entire process. 

Now back to work to finish the last details:-)

Tuesday, March 9, 2010

Final Approvals!

The City of Kirkland has numerous signoffs required along the way to completing a project.  We are down to the last few FINAL Inspections.  We got the Electrical and Public Works Final Approvals Today.  That just leaves Planning and Building Dept. Final Approvals.  I plan on calling for those by the end of this week or the beginning of the next!  Things are looking good! :-)

Monday, March 8, 2010

Cork Flooring

Kitchen Cork Tile floor......Check......Oh yeah it needs a final seal coat and also the cabinet base trim now

Updates

Stairs and Railings......CHECK...Oh yeah, fix a couple of brackets, move light switch, paint bolt heads
Outside
Inside
Front Door .....CHECK.....Oh yeah, finish trim, plug screw holes and prepare and install door hardware
Kitchen.....CHECK.....Oh yeah, install cork flooring, install dishwasher, finish trimming light cables
Kitchen Bar Counter.....CHECK....Oh yeah, sand and stain brackets, trim out front panels, and get one more finish coat on the top.


Moral of this post.........Things are done but never quite done really :-)  There are a lot of little things to actually be 100% conmplete!

Thursday, March 4, 2010

Internet at the House!!

Kitchen w/Chef and all the lighting in place!
Shot of lighting at the Island
Lighting in the Master Bathroom

We finally have internet at the house so hopefully more frequent updates will be forthcoming :-)

Friday, February 26, 2010

More Installations

The Kitchen Hood is now in, and not a day to soon as it is raining today and cutting a hole in the roof would not have been good!
Master Bathroom sink and faucet are installed. 

Also the laundry sink, the second bathroom sink and faucet, the prep sink/steamer in the kitchen, the powder room pedestal sink and faucet, and the dishwasher hookups are all getting finished today.  Basically plumbing should be 100% complete by the end of the day :-)
The Meditation Room has the cork flooring down and is ready for finish trim.  Ignore the door on the left it needs to be installed elsewhere in the house.

Also the Front door is back off and is in the good hands of Steve of Foremost Finishes for staining.  Also all the trim is off getting stained right now. 

That's all for now.......back to work!!

Wednesday, February 24, 2010

More Door, Railings & Countertops

Father & Daughter in front of the Custom Door
Railings from the Living Area

And from the Family Room below

Paperstone counter in the Second bathroom.  Backsplash is not in place yet.

Kirei Counter and Backsplash in the Master Bathroom


Big shoutout to Steve @ Foremost Finishes for staining and sealing the counters!  As near as I can tell he stopped counting after 10 coats!!!  Wait unitil you see the Butcher block Breakfast Bar :-)