Friday, February 26, 2010

More Installations

The Kitchen Hood is now in, and not a day to soon as it is raining today and cutting a hole in the roof would not have been good!
Master Bathroom sink and faucet are installed. 

Also the laundry sink, the second bathroom sink and faucet, the prep sink/steamer in the kitchen, the powder room pedestal sink and faucet, and the dishwasher hookups are all getting finished today.  Basically plumbing should be 100% complete by the end of the day :-)
The Meditation Room has the cork flooring down and is ready for finish trim.  Ignore the door on the left it needs to be installed elsewhere in the house.

Also the Front door is back off and is in the good hands of Steve of Foremost Finishes for staining.  Also all the trim is off getting stained right now. 

That's all for now.......back to work!!

No comments: