Monday, March 8, 2010

Updates

Stairs and Railings......CHECK...Oh yeah, fix a couple of brackets, move light switch, paint bolt heads
Outside
Inside
Front Door .....CHECK.....Oh yeah, finish trim, plug screw holes and prepare and install door hardware
Kitchen.....CHECK.....Oh yeah, install cork flooring, install dishwasher, finish trimming light cables
Kitchen Bar Counter.....CHECK....Oh yeah, sand and stain brackets, trim out front panels, and get one more finish coat on the top.


Moral of this post.........Things are done but never quite done really :-)  There are a lot of little things to actually be 100% conmplete!

1 comment:

Anonymous said...

Cool door! -clay