Sunday, April 5, 2009

Temporary Power

I have found out Puget Sound Energy has some specfic requirements for the location of temporary construction power. After much back and forth and a site visit my location has been approved by PSE and inspected by the city of Kirkland. We just need PSE to schedule their work. I want to disconnect power to the house and relocate it onto the pole which is out of the way. Then I can strip the electrical out of the house easily. Plus the roof is coming off so weather might become an issue with the existing service :-) FYI, I got the temporary power panel on Craigslist for $50. I had to add the pole and rerun the ground but still saved probably $100! Gota love Craigslist :-)

No comments: