Friday, May 22, 2009

Preparing for Slab Pouring

Insulation sheets with the in-floor heating tubing on top. Walls are sprayed to assist in the layout
Back Patio is formed up, with steps from the family room, master bedroom, and down into the yard ready for the pour.


No comments: