Our Home
Friday, May 22, 2009
Preparing for Slab Pouring
Insulation sheets with the in-floor heating tubing on top. Walls are sprayed to assist in the layout
Back Patio is formed up, with steps from the family room, master bedroom, and down into the yard ready for the pour.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment