Saturday, May 2, 2009

Prepping for Concrete Slabs

Inside the House - Trenches are dug for the the thickened slab (where bearing walls will go above) and 5/8"- gravel is in place to level things out
Rear covered Patio - leveled with the 5/8"- gravel, preparing it for compacting prior to the concrete pour


No comments: