Tuesday, August 4, 2009

Last of the Framing

So there are no walls left to frame. The crew put in the two closets along the side of the main living space. Just some misc. details, the back deck, and the rest of the T&G roof decking to go now. Standing in the entry looking across the stairs. The door is to the office.
Looking through the Dining and Kitchen. The pantry is on the left and the powder room is on the right. The two closets are actually done and are located on the right but are not shown in this picture.

Tomorrow we get the rest of the decking and the material for the back deck. We should also get the S.I.P.s which are the insulated panels for the roof. They are 9 3/4" of styrofoam type material with OSB on one side. Should be interesting :-)

No comments: