Monday, September 7, 2009

Living Right

We must be "Living Right" Since our roof just got done on Friday and it has spent the last three days in Seattle raining pretty hard, off and on! Having the roof feels gooooood :-)

Got the electricians started today and I finally got some temporary protective covering down on the concrete floors. This will save them from getting all beat up during the construction.

Tomorrow there will be four crews onsite so wish us all a peaceful and productive day :-)

1. Plumbers - Back to adjust the location of the Master bathroom shower heads. A minor thing but we might as well get them right where we want all THREE of them.
2. Framers - Working on the siding, specifically the Board and Batten Hardipanel siding on the side of the garage. I have simplified the elevations and eliminated all of the metal and will go with the B&B instead. Looks good.
3. Gas Piping Installer - We finally got the outside meter relocated so now we can run all the inside gas lines for the boiler, future fireplace, etc.
4. Electrician - Running all the wiring, cabling and speaker wires. Plus wiring the panel

1 comment:

Unknown said...

We were happy to come across your blog today and are excited about
your remodel. With your permission (and all credit to
you of course) we would love to share your remodeling journey on our Facebook page, www.facebook.com/jameshardieBP. If you can email us at onlineoutreach@jameshardie.com with a few details about your project we would be happy to share your story with our fans. Make sure to connect with us on Facebook www.facebook.com/jameshardieBP and Twitter @James_Hardie to receive updates, news and more about James Hardie!