The tarp is back in place to keep the "man cave" dry, but underneath, the second floor beams and floor are done! FYI, The "man cave" is the downstairs front bedroom that we are using as a jobsite office/storage room
View from the future drive. The flooring is down in the garage and the main(2nd) floor except for the far back of the Living and Dining rooms.